This chart provides access to detailed information about our rate options and associated charges. The Minnesota Resource Adjustment includes some other charges you may notice on your bill.
Electric service | Effective date | |
---|---|---|
Index and General Rules and Regulations | 09/01/2024 |
10.01 | Small General Service (less than 20 kw) | 10/01/2023 |
10.02 | General Service (20 kw or greater) | 07/01/2022 |
10.03 | General Service - Time of use | 07/01/2022 |
Time of Use Period Chart | ||
10.04 | Large General Service | 07/01/2022 |
10.05 | Large General Service - Time of Day | 07/01/2022 |
Time of Day Period Chart | ||
10.06 | Super Large General Service | 07/01/2022 |
10.07 | Electric Vehicle Direct Current Fast Charging General Service - Time of Day | 12/01/2023 |
11.01 | Standby Service | 07/01/2022 |
Time of Day Period Chart | ||
11.02 | Irrigation Service | 07/01/2022 |
Time of Use Period Chart | ||
11.03 | Outdoor Lighting - Energy Only | 07/01/2022 |
11.04 | Outdoor Lighting - Dusk to Dawn (CLOSED) | 07/01/2022 |
11.05 | Municipal Pumping Service | 07/01/2022 |
11.06 | Civil Defense - Fire Sirens | 07/01/2022 |
11.07 | LED Street and Area Lighting - Dusk to Dawn | 01/01/2023 |
12.00 | Purchase-Power Riders - Availability Matrix | 07/01/2022 |
12.01 | Small Power Producer Rider (Net Energy Billing Rate) - Residential, Farm, General Service, Large General Service | 04/01/2024 |
12.02 | Small Power Producer Rider (Simultaneous Purchase and Sale Billing Rate) - Firm Power, Non-firm Power | 04/01/2024 |
12.03 | Small Power Producer Rider (Time of Day Purchase Rates) - Firm Power, Non-Firm Power | 04/01/2024 |
12.04 | Distributed Generation Service Rider | 05/01/2024 |
12.05 | Community-Based Energy Development (C-BED) Tariff | 08/15/2018 |
13.00 | Mandatory Riders - Applicability matrix | 06/01/2024 |
13.01 | Energy Adjustment Rider | 01/01/2023 |
13.02 | Conservation Improvement Project (CIP) Rider | 02/01/2024 |
13.03 | Competitive Rate Rider - Large General Service | 02/01/2019 |
13.04 | Renewable Resource Cost Recovery Rider | 09/01/2024 |
13.05 | Transmission Cost Recovery Rider | 04/01/2024 |
13.06 | Reserved for Future Use | 11/01/2017 |
13.07 | Uplift Program Rider | 09/01/2024 |
13.08 | Environmental Cost Recovery Rider | 02/01/2019 |
13.09 | Energy-Intensive, Trade-Exposed (EITE) Rider | 01/01/2024 |
13.10 | Revenue Decoupling Mechanism (RDM) Rider | 10/01/2024 |
13.11 | Electric Utility Infrastructure Cost (EUIC) Recovery Rider | 04/01/2024 |
14.00 | Voluntary Riders - Availability Matrix | 06/01/2024 |
14.01 | Water Heating Control Rider | 07/01/2022 |
14.02 | Real Time Pricing Rider | 01/01/2024 |
14.03 | Large General Service Rider | 01/01/2024 |
14.04 | Controlled Service - Interruptible Load Self-Contained and CT Metering Rider (Dual Fuel) | 07/01/2022 |
14.05 | Reserved for Future Use | 07/01/2022 |
14.06 | Controlled Service - Deferred Load Rider (Thermal Storage) | 07/01/2022 |
14.07 | Fixed Time of Service Rider | 07/01/2022 |
14.08 | Air Conditioning Control Rider (CoolSavings) | 02/01/2019 |
14.09 | Voluntary Renewable Energy Rider (TailWinds) | 07/01/2022 |
14.10 | WAPA Bill Crediting Program Rider | 01/01/2021 |
14.11 | Reserved for Future Use | 11/01/2017 |
14.12 | Off-Peak Electric Vehicle Rider | 07/01/2022 |
14.13 | Reserved for Future Use | 06/01/2024 |
14.14 | My Renewable Energy Credits (My RECs) Rider | 06/01/2024 |
15.00 | Communities Served | 11/01/2017 |