The schedules in these tables don't include sales tax, adjustments, or riders, which may vary by month and state. For complete terms and other rates, such as outdoor lighting, farm service, or irrigation, see rates, rules, and regulations. Charges apply monthly.
Rate codes: 404—secondary; 405—primary; 408—nonmetered (closed)
This schedule is applicable to both single- and three-phase non-residential customers with demands below 20 kilowatts (kW) and to residential customers with three-phase service only with demands below 20 kW. This schedule isn't applicable for dusk to dawn outdoor lighting.
404: Secondary Service; 405: Primary Service
Please note that Minnesota and North Dakota schedule 408: Non-metered service - Secondary only-1000 watts or less - is closed to new installations.
During a rate review an interim rate adjustment may apply to the charges below.
Minnesota | North Dakota | South Dakota | |
---|---|---|---|
404 and 405 Customer charge |
$18.50 | $24.90 | $20.00 |
408 Customer charge |
$5.50 | NA | NA |
Monthly minimum | Customer + Facilities Charge | Customer Charge | Customer Charge |
Facilities | $0.00 | NA | NA |
404 Kilowatt-hour charge June - September |
7.546¢ | 6.682¢ | 6.820¢ |
404 Kilowatt-hour charge October – May |
5.595¢ | 4.521¢ | 4.614¢ |
405 Kilowatt-hour charge June - September |
7.329¢ | 6.440¢ | 6.572¢ |
405 Kilowatt-hour charge October-May |
5.471¢ | 4.331¢ | 4.420¢ |
408 Kilowatt-hour charge June - September |
7.546¢ | 6.681¢ | NA |
408 Kilowatt-hour charge October - May |
5.595¢ | 6.681¢ | NA |
Download | Download | Download |
Rate codes: 401—secondary; 403—primary
This schedule is applicable to three-phase residential customers, and both single- and three-phase non-residential customers, with a measured demand of at least 20 kilowatts (kW) during the most recent 12 months. This schedule isn't applicable for dusk to dawn outdoor lighting.
Low load factor demand charges only apply to customers that have both a metered demand of 200 kW or greater and a monthly load factor of 15% or less.
During a rate review an interim rate adjustment may apply to the charges below.
Minnesota | North Dakota | South Dakota | |
---|---|---|---|
Secondary Service (401) | |||
Customer charge | $39.00 | $31.90 | $25.00 |
Facility charge | $1.50/kW of annual maximum demand (minimum 20 kW) |
98¢/kW of annual maximum demand (minimum 20 kW) |
$1.00/kW of annual maximum demand (minimum 20 kW) |
Minimum bill | Customer + Facilities + Demand Charges |
Customer + Facilities Charges | Customer + Facilities + Demand + Low Load Factor Charges |
Kilowatt-hour charge June - September |
4.644¢ | 7.506¢ | 3.393¢ |
Kilowatt-hour charge October - May |
5.272¢ | 5.078¢ | 3.363¢ |
Demand charge per kilowatt June - September |
$2.00 (minimum 20 kW) | NA | $3.60 (minimum 20 kW) |
Demand charge per kilowatt October - May |
$1.00 (minimum 20 kW) | NA | $2.18 (minimum 20 kW) |
Low load factor per kilowatt per month |
NA | NA | $3.54/kW |
Primary Service (403) | |||
Customer charge | $26.00 | $21.30 | $20.00 |
Facility charge | $1.01/kW of annual maximum demand (minimum 20 kW) |
65¢/kW of annual maximum demand (minimum 20 kW) |
67¢/kW of annual maximum demand (minimum 20 kW) |
Minimum bill | Customer + Facilities + Demand Charges |
Customer + Facilities Charges | Customer + Facilities + Demand + Low Load Factor Charges |
Kilowatt-hour charge June - September |
4.581¢ | 7.233¢ | 3.282¢ |
Kilowatt-hour charge October - May |
5.184¢ | 4.865¢ | 3.235¢ |
Demand charge per kilowatt June - September |
$1.92 (minimum 20 kW) | NA | $3.46 (minimum 20 kW) |
Demand charge per kilowatt October - May |
$.97 (minimum 20 kW) | NA | $2.08 (minimum 20 kW) |
Low load factor per kilowatt per month |
NA | NA | $3.54/kW |
Download | Download | Download |
Rate code: 708
This schedule is applicable to nonresidential customers with one meter providing electrical service with a measured demand of at least 20 kW within the most recent 12 months. This rate has three time-of-use price periods that vary by state and by season. Billing demand is based on the highest demand registered over any one hour during the month.
Review the full schedule for information about declared-peak notifications.
During rate reviews an interim rate adjustment may apply to the charges below.
Minnesota |
North Dakota |
South Dakota | |
---|---|---|---|
Customer charge | $59.00 | $219.00 | $200.00 |
Monthly minimum | Customer + facilities + demand charges |
Customer + facilities charges | Customer + facilities + demand + low load factor demand charges |
Facilities charge | $2.12/kW per annual max kW (min 20 kW) |
98¢/kW per annual max kW (min 20 kW) |
$1.00/kW per annual max kW (min 20 kW) |
Energy charge per kilowatt-hour |
|||
Declared-peak June - September |
79.499¢ | 43.264¢ | 28.829¢ |
Declared-peak October – May |
22.768¢ | 16.259¢ | 30.322¢ |
Intermediate June - September |
3.395¢ | 2.571¢ | 3.236¢ |
Intermediate October – May |
3.632¢ | 2.638¢ | 3.206¢ |
Off-peak June - September |
2.350¢ | 1.702¢ | 2.163¢ |
Off-peak October – May |
2.948¢ | 1.845¢ | 2.277¢ |
Demand charge per kilowatt |
|||
Declared-peak June - September |
NA | $0.00 | $0.00 |
Declared-peak October – May |
NA | $0.00 | $0.00 |
Intermediate June - September |
$2.92 | $3.44 | $4.67 |
Intermediate October – May |
$4.44 | $5.12 | $2.84 |
Off-peak June - September |
$0.00 | $0.00 | $0.00 |
Off-peak October - May |
$0.00 | $0.00 | $0.00 |
Download | Download | Download |
Rate codes: 602, 603, 632
These are standard, non-controlled rates for non-residential customers.
During a rate review an interim rate adjustment may apply to the charges below.
Section 10.04 - 602, 603, 632
Minnesota | North Dakota | South Dakota | |
---|---|---|---|
603 - Secondary Service |
|||
Customer charge | $93.00 | $215.90 | $215.90 |
Facilities charge | $1.03/kW <1000 kW 67¢/kW >= 1000 kW per annual max kW per month (min 80 kW) |
76¢/kW <1000 kW 56¢/kW >= 1000 kW per annual max kW per month (min 80 kW) |
77¢/kW <1000 kW 57¢/kW >= 1000 kW per annual max kW per month (min 80 kW) |
Monthly minimum | Customer + facilities + demand charges |
Customer + facilities + demand charges |
Customer + facilities + demand charges |
Billing demand per kilowatt June - September |
$13.99 (min 80 kW) | $10.75 (min 80 kW) | $10.84 (min 80 kW) |
Billing demand per kilowatt October - May |
$11.25 (min 80 kW) | $8.54 (min 80 kW) | $6.64 (min 80 kW) |
Excess billing demand | Demand may be increased 1 kW for each whole 10 kVar of measured reactive demand in excess of 50% of the metered demand in kW. | Demand shall be increased 1 kW for each whole 10 kVar of measured reactive demand in excess of 50% of the metered demand in kW. | Demand may be increased 1 kW for each whole 10 kVar of measured reactive demand in excess of 50% of the metered demand in kW. |
Kilowatt-hour charge June - September |
2.590¢ | 2.286¢ | 2.291¢ |
Kilowatt-hour charge October - May |
2.950¢ | 2.341¢ | 2.271¢ |
602 - Primary Service |
|||
Customer charge | $253.00 | $282.00 | $282.00 |
Facilities charge | 49¢/ kW per annual max demand per month (min 80 kW) |
48¢/kW per annual max demand per month (min 80kW) |
49¢/kW per annual max demand per month (min 80 kW) |
Monthly minimum | Customer + facilities + demand charges |
Customer + facilities + demand charges |
Customer + facilities + demand charges |
Billing demand per kW June - September |
$13.64 (min 80 kW) | $10.35 (min 80 kW) | $10.39 (min 80 kW) |
Billing demand per kW October - May |
$10.89 (min 80 kW) | $8.15 (min 80 kW) | $6.34 (min 80 kW) |
Excess billing demand | Demand may be increased 1 kW for each whole 10 kVar of measured reactive demand in excess of 50% of the metered demand in kW. | Demand shall be increased 1 kW for each whole 10 kVar of measured reactive demand in excess of 50% of the metered demand in kW. | Demand may be increased 1 kW for each whole 10 kVar of measured reactive demand in excess of 50% of the metered demand in kW. |
Kilowatt-hour charge June - September |
2.230¢ | 2.224¢ | 2.219¢ |
Kilowatt-hour charge October - May |
2.530¢ | 2.264¢ | 2.187¢ |
632 - Transmission Service |
|||
Customer charge | $253.00 | $282.00 | $282.00 |
Facilities charge | $0.00/ kW per annual max demand per month (min 80kW) |
$0.00/ kW per annual max demand per month (min 80kW) |
$0.00/ kW per annual max demand per month (min 80kW) |
Monthly minimum | Customer + facilities + demand charges |
Customer + facilities + demand charges | Customer + facilities + demand charges |
Billing demand per kW June - September |
$12.74 (min 80 kW) | $8.85 (min 80 kW) | $8.50 (min 80 kW) |
Billing demand per kW October - May |
$9.97 (min 80 kW) | $7.30 (min 80 kW) | $4.24 (min 80 kW) |
Excess billing demand | Demand may be increased 1 kW for each whole 10 kVar of measured reactive demand in excess of 50% of the metered demand in kW. | Demand shall be increased 1 kW for each whole 10 kVar of measured reactive demand in excess of 50% of the metered demand in kW. | Demand may be increased 1 kW for each whole 10 kVar of measured reactive demand in excess of 50% of the metered demand in kW. |
Kilowatt-hour charge June - September |
2.010¢ | 2.103¢ | 2.119¢ |
Kilowatt-hour charge October - May |
2.200¢ | 2.121¢ | 2.070¢ |
Download | Download | Download |
Rate codes: 610, 611, 639
This rate schedule is applicable for monthly billing to non-residential customers with measured demand of at least 80 kilowatts within the most recent 12 months. This rate has three time-of-day price periods that vary by state and season.
During rate reviews an interim rate adjustment may apply to the charges below.
Section 10.05 - 610, 611, 639
Minnesota | North Dakota | South Dakota | ||
---|---|---|---|---|
611 - Secondary Service |
||||
Customer charge | $102.00 | $215.90 | $215.90 | |
Facilities charge | 76¢/kW <1000 kW 57¢/kW >= 1000 kW per month per annual max kW (minimum 80 kW) |
76¢/kW <1000 kW 57¢/kW >= 1000 kW per month per annual max kW (minimum 80 kW) |
76¢/kW <1000 kW 57¢/kW >= 1000 kW per month per annual max kW (minimum 80 kW) |
|
Monthly minimum | Customer + facilities charges | Customer + facilities + demand charges |
$325.00 + customer + facilities charges |
|
Excess billing demand | Demand may be increased 1 kW for each whole 10 kVar of measured reactive demand in excess of 50% of the metered demand in kW. | Demand may be increased 1 kW for each whole 10 kVar of measured reactive demand in excess of 50% of the metered demand in kW. | Demand may be increased 1 kW for each whole 10 kVar of measured reactive demand in excess of 50% of the metered demand in kW. | |
Energy charge per kilowatt-hour | ||||
On-Peak June-September |
3.600¢/kWh | 3.527¢/kWh | 3.480¢/kWh | |
On-Peak October-May |
3.460¢/kWh | 3.090¢/kWh | 2.946¢/kWh | |
Shoulder June-September |
3.120¢/kWh | 2.683¢/kWh | 2.651¢/kWh | |
Shoulder October-May |
3.170¢/kWh | 2.753¢/kWh | 2.628¢/kWh | |
Off-peak June-September |
1.600¢/kWh | 1.776¢/kWh | 1.772¢/kWh | |
Off-peak October-May |
1.840¢/kWh | 1.925¢/kWh | 1.866¢/kWh | |
Demand charge per kilowatt | ||||
On-Peak June-September |
$11.65/kW | $7.31/kW | $7.42/kW | |
Peak October-May |
$8.63/kW | $5.29/kW | $3.80/kW | |
Shoulder June-September |
$2.34/kW | $3.44/kW | $3.42/kW | |
Shoulder October-May |
$2.62/kW | $3.25/kW | $2.84/kW | |
Off-peak June-September |
$0.00/kW | $0.00/kW | NA | |
Off-peak October-May |
$0.00/kW | $0.00/kW | NA | |
610 - Primary Service |
||||
Customer charge | $273.00 | $282.00 | $282.00 | |
Facilities charge | 48¢/kW per month per annual max kW (minimum 80 kW) |
48¢/kW per month per annual max kW (minimum 80 kW) |
48¢/kW per month per annual max kW (minimum 80 kW) |
|
Monthly minimum | Customer + facilities charges | Customer + facilities + demand charges |
$325.00 + customer + facilities charges |
|
Excess billing demand | Demand may be increased 1 kW for each whole 10 kVar of measured reactive demand in excess of 50% of the metered demand in kW. | Demand may be increased 1 kW for each whole 10 kVar of measured reactive demand in excess of 50% of the metered demand in kW. | Demand may be increased 1 kW for each whole 10 kVar of measured reactive demand in excess of 50% of the metered demand in kW. | |
Energy charge per kilowatt-hour | ||||
On-Peak June-September |
3.310¢/kWh | 3.422¢/kWh | 3.351¢/kWh | |
On-Peak October-May |
3.140¢/kWh | 2.981¢/kWh | 2.821¢/kWh | |
Shoulder June-September |
2.890¢/kWh | 2.612¢/kWh | 2.562¢/kWh | |
Shoulder October-May |
2.900¢/kWh | 2.665¢/kWh | 2.526¢/kWh | |
Off-peak June-September |
1.500¢/kWh | 1.738¢/kWh | 1.721¢/kWh | |
Off-peak October-May |
1.700¢/kWh | 1.871¢/kWh | 1.800¢/kWh | |
Demand charge per kilowatt | ||||
On-Peak June-September |
$11.19/kW | $7.05/kW | $7.12/kW | |
On-Peak October-May |
$8.34/kW | $5.03/kW | $3.62/kW | |
Shoulder June-September |
$2.45/kW | $3.29/kW | $3.27/kW | |
Shoulder October-May |
$2.55/kW | $3.12/kW | $2.72/kW | |
Off-peak June-September |
$0.00/kW | $0.00/kW | NA | |
Off-peak October-May |
$0.00/kW | $0.00/kW | NA | |
639 - Transmission Service |
||||
Customer charge | $273.00 | $282.00 | $282.00 | |
Facilities charge | 0¢/kW per month per annual max kW (minimum 80 kW) | 0¢/kW per month per annual max kW (minimum 80 kW) | 0¢/kW per month per annual max kW (minimum 80 kW) | |
Monthly minimum | Customer + facilities charges | Customer + facilities + demand charges |
$325.00 + customer + facilities charges |
|
Excess billing demand | Demand may be increased 1 kW for each whole 10 kVar of measured reactive demand in excess of 50% of the metered demand in kW. | Demand may be increased 1 kW for each whole 10 kVar of measured reactive demand in excess of 50% of the metered demand in kW. | Demand may be increased 1 kW for each whole 10 kVar of measured reactive demand in excess of 50% of the metered demand in kW. | |
Energy charge per kilowatt-hour |
||||
On-Peak June-September |
2.810¢/kWh | 3.213¢/kWh | 3.146¢/kWh | |
On-Peak October-May |
2.640¢/kWh | 2.775¢/kWh | 2.626¢/kWh | |
Shoulder June-September |
2.490¢/kWh | 2.465¢/kWh | 2.418¢/kWh | |
Shoulder October-May |
2.500¢/kWh | 2.494¢/kWh | 2.364¢/kWh | |
Off-peak June-September |
1.250¢/kWh | 1.653¢/kWh | 1.637¢/kWh | |
Off-peak October-May |
1.450¢/kWh | 1.760¢/kWh | 1.694¢/kWh | |
Demand charge per kilowatt |
||||
On-Peak June-September |
$10.87/kW | $6.11/kW | $5.71/kW | |
On-Peak October-May |
$7.71/kW | $4.58/kW | $2.75/kW | |
Shoulder June-September |
$1.87/kW | $2.74/kW | $2.79/kW | |
Shoulder October-May |
$2.26/kW | $2.72/kW | $1.49/kW | |
Off-peak June-September |
$0.00/kW | $0.00/kW | NA | |
Off-peak October-May |
$0.00/kW | $0.00/kW | NA | |
Download Time of day chart |
Download Time of day chart |
Rate codes: 618, 620
This rate schedule is designed to enable our company to respond to potential customers by providing rate quotes and final rates based on a rate formula reviewed by Commission staff.
Application: This rate schedule is applicable to greenfield customers who reasonably demonstrate:
(1) An expected metered demand of at least 25 megawatts at a single metering point,
(2) An expected load factor of at least 80%, and
(3) An expected annual energy sales of at least 175,000 megawatt-hours over 12 consecutive billing months.
Customers will meet the above criteria to obtain and maintain service on this rate. Customers served on this rate who don't meet the above criteria will be moved to the most applicable rate schedule.
This schedule isn't applicable for energy for resale. Emergency and supplementary/standby service will be supplied only as allowed by law.
We require a written electric service agreement (ESA) between our company and the customer. We'll file the customer’s executed ESA as a contract with deviations for Commission approval.
Rate determination: The rate specified in each customer's ESA shall be based upon and reflect either the marginal unit costs expected during the effective rate period or the marginal unit costs plus an appropriate margin determined on a case-by-case basis.
Review the applicable rate schedule for full details.
Minnesota | North Dakota | South Dakota | |
---|---|---|---|
Rate schedule | Download | Download | Download |
Rate codes: 185 (185P—penalty), 190 (190P—penalty)
This rate is for permanently connected interruptible heating loads with alternate fuel backup systems served with self-contained (typical) metering. You also may include water heaters and/or other permanently connected approved loads on this rate when other interruptible load is in use. Heating loads may be controlled up to 24 hours a day and water heating loads may be controlled up to 14 hours a day. Rate 185 allows for air-source heat pump loads to be cycled 15 minutes on and 15 minutes off during summer control periods.
During rate reviews an interim rate adjustment may apply to the charges below.
Section 14.04 (in MN) 14.05 (in ND and SD) - 185, 190
Minnesota | North Dakota | South Dakota | |
---|---|---|---|
Customer charge | $6.00 | $8.50 | $10.00 |
Monthly minimum bill | Customer + facilities charges |
Customer + facilities charges |
Customer + facilities charges |
Facility charge | $10.50 | $11.70 | $9.50 |
Kilowatt-hour charge June - September |
2.738¢ | 0.911¢ | 1.222¢ |
Kilowatt-hour charge October - May |
2.341¢ | 0.850¢ | 1.024¢ |
Penalty charge /kWh June-September |
63.450¢ | 41.350¢ | 26.749¢ |
Penalty charge /kWh October-May |
15.853¢ | 17.038¢ | 17.205¢ |
Download | Download | Download |
Rate codes: 165 (165P—penalty), 170 (170P—penalty); 168C, 169C
This tariff is for permanently connected interruptible heating loads with alternate fuel backup systems serviced by current transformer (CT) metering. You also may include water heaters on this rate when other qualified interruptible load is in use. Heating loads may be controlled up to 24 hours a day and water heating loads may be controlled up to 14 hours a day. This tariff does allow for short-duration cycling of qualified summer-season loads during control periods. To accommodate system controls, Option 2 permits up to 5% of off-peak-load use to remain in service during control periods. The penalty provision of this tariff isn't intended as a buy-through option.
During rate reviews an interim rate adjustment may apply to the charges below.
Section 14.04 - 165, 168, 169, 170
Minnesota | North Dakota | South Dakota | |
---|---|---|---|
Option 1 |
|||
Customer charge | $24.04 | $20.20 | $15.00 |
Monthly minimum bill | Customer + facilities charges |
Customer + facilities charges |
Customer + facilities charges |
Facilities charge | 45.0¢/kW of annual max. demand per month |
76.0¢/kW of annual max. demand per month |
50.0¢/kW of annual max. demand per month |
Kilowatt-hour charge June - September |
1.867¢ | 1.064¢ | 1.192¢ |
Kilowatt-hour charge October - May |
1.597¢ | 1.009¢ | 0.999¢ |
Penalty charge/kWh June - September |
63.450¢ | 41.350¢ | 26.749¢ |
Penalty charge/kWh October - May |
15.853¢ | 14.322¢ | 17.205¢ |
Option 2 |
|||
Customer charge | $20.00 | $20.20 | $15.00 |
Monthly minimum bill | Customer + facilities charges |
Customer + facilities charges |
Customer + facilities charges |
Facilities charge | 50.0¢/kW of annual max. demand per month |
76.0¢/kW of annual max. demand per month |
50.0¢/kW of annual max. demand per month |
Kilowatt-hour charge June - September |
2.509¢ | 1.064¢ | 1.481¢ |
Kilowatt-hour charge October - May |
1.871¢ | 1.009¢ | 1.219¢ |
Control period demand charge June- September |
$13.99/kW | $11.30/kW | $10.84/kW |
Control period demand charge October - May |
$11.25/kW | $8.49/kW | $6.64/kW |
Download | Download | Download |
Rate codes: 195 (195P—penalty), 197 (197P—penalty)
This rider is for both residential and non-residential service to any approved permanently connected deferred loads. These loads primarily are thermal storage, such as underfloor heating or central-storage furnaces, and may include water heaters, electric vehicle charging, and heat pumps when heat storage is also in use. Loads may be controlled up to 14 hours a day, as measured from midnight to midnight. Optional rate 195 allows for qualified summer-season loads, such as heat pumps, to be cycled 15 minutes on and 15 minutes off during control periods.
During a rate review an interim rate adjustment may be applied to the charges below.
Section 14.06 - 195, 197
Minnesota | North Dakota | South Dakota | |
---|---|---|---|
Customer charge | $11.00 | $8.80 | $8.50 |
Monthly minimum bill | Customer + facilities charges |
Customer + facilities charges |
Customer + facilities charges |
Facilities charge | $11.00 | $11.60 | $11.00 |
Kilowatt-hour charge June - September |
3.468¢ | 2.602¢ | 2.406¢ |
Kilowatt-hour charge October - May |
3.603¢ | 2.371¢ | 2.192¢ |
Penalty charge June - September |
44.913¢ | 35.916¢ | 26.749¢ |
Penalty charge October - May |
14.085¢ | 16.537¢ | 17.205¢ |
Download | Download | Download |
Rate code: 301 (301P—penalty)
This is for permanently connected deferred loads with primary current transformer (CT) metering served at primary voltage. Loads are thermal-storage space heating or cooling and other approved loads. Energy is delivered between 10:00 p.m. and 6:00 a.m. All other hours of electric service are unauthorized and subject to penalty period kilowatt-hour charges. Penalty rates aren't intended as buy-through options.
During a rate review an interim rate adjustment may apply to the charges below.
14.07 - 303
Minnesota | North Dakota | South Dakota | |
---|---|---|---|
Customer charge | $9.00 | $6.70 | $6.70 |
Monthly minimum bill | Customer + facilities charges | Customer + facilities charges | Customer + facilities charges |
Facilities charge | $16.00 | $18.00 | $16.00 |
Kilowatt-hour charge June - September |
1.028¢ | 1.433¢ | 0.964¢ |
Kilowatt-hour charge October - May |
1.104¢ | 1.585¢ | 1.010¢ |
Penalty charge/kWh June - September |
6.485¢ | 6.736¢ | 6.081¢ |
Penalty charge/kWh October - May |
4.271¢ | 4.602¢ | 4.761¢ |
Download | Download | Download |
Rate code: 302 (302P—penalty)
This is for permanently connected deferred loads with current transformer (CT) metering, primarily thermal-storage space heating or other approved loads. Energy is delivered between 10:00 p.m. and 6:00 a.m. All other hours of electric service are unauthorized and subject to penalty period kilowatt-hour charges. Penalty rates aren't intended as buy-through options.
During rate reviews an interim rate adjustment may apply to the charges below.
14.07 - 302
Minnesota | North Dakota | South Dakota | |
---|---|---|---|
Customer charge | $9.00 | $6.70 | $6.70 |
Monthly minimum bill | Customer + facilities charges |
Customer + facilities charges |
Customer + facilities charges |
Facilities charge | $32.00 | $38.00 | $32.00 |
Kilowatt-hour charge June - September |
1.032¢ | 1.439¢ | 0.968¢ |
Kilowatt-hour charge October - May |
1.109¢ | 1.591¢ | 1.014¢ |
Penalty charge/kWh June - September |
6.485¢ | 6.736¢ | 6.081¢ |
Penalty charge/kWh October - May |
4.271¢ | 4.602¢ | 4.761¢ |
Download | Download | Download |
Rate code: 303 (303P—penalty)
This is for permanently connected deferred loads with primary current transformer (CT) metering served at primary voltage. Loads are thermal-storage space heating or cooling and other approved loads. Energy is delivered between 10:00 p.m. and 6:00 a.m. All other hours of electric service are unauthorized and subject to penalty period kilowatt-hour charges. Penalty rates aren't intended as buy-through options.
During a rate review an interim rate adjustment may apply to the charges below.
14.07 - 303
Minnesota | North Dakota | South Dakota | |
---|---|---|---|
Customer charge | $9.00 | $6.70 | $6.70 |
Monthly minimum bill | Customer + facilities charges | Customer + facilities charges | Customer + facilities charges |
Facilities charge | $16.00 | $18.00 | $16.00 |
Kilowatt-hour charge June - September |
1.028¢ | 1.433¢ | 0.964¢ |
Kilowatt-hour charge October - May |
1.104¢ | 1.585¢ | 1.010¢ |
Penalty charge/kWh June - September |
6.485¢ | 6.736¢ | 6.081¢ |
Penalty charge/kWh October - May |
4.271¢ | 4.602¢ | 4.761¢ |
Download | Download | Download |
Rate codes: 760, 762
This tariff is available to residential customers on our Residential Service, RDC, or Farm Service Rates; and to commercial customers on our Small General Service (less than 20 kilowatts) and General Service Rates. Participating eligible commercial customers may receive monthly bill credits for each ton of connected cooling load.
Central cooling equipment will be cycled on a 15-minute on/15-minute off schedule. Commercial customer dual stage air conditioners (or heat pumps) will be allowed to have the first stage run without interruption while the second stage will be shut off for the entire load management period.
Monthly bill credit may be prorated and applies June through September. Air conditioning may be cycled a maximum of 300 hours during the cooling season.
Section 14.08 - 760, 762
Minnesota | North Dakota | South Dakota | |
---|---|---|---|
Residential Monthly Credit June - September | $8.25 | $8.25 | $8.25 |
Commercial Monthly Credit Per Ton June - September | $6.00 | $6.00 | $6.00 |
Download | Download | Download |
Rate code: 191
This rate applies to water heaters that are metered separately and subject to controlled service. Water heaters may be controlled up to 14 hours a day.
During a rate review an interim rate adjustment may apply to the charges below.
Section 14.01 - 191
Minnesota | North Dakota | South Dakota | |
---|---|---|---|
Customer charge | $5.75 | $4.00 | $4.00 |
Monthly minimum bill | Customer + facilities charges | Customer + facilities charges | Customer + facilities charges |
Facilities charge | $0.00 | $2.00 | $2.00 |
Kilowatt-hour charge June - September |
3.084¢ | 3.078¢ | 2.442¢ |
Kilowatt-hour charge October - May |
3.204¢ | 2.661¢ | 2.097¢ |
Download | Download | Download |
Rate code: 192
Customers on base residential, farm, or general commercial tariffs may receive a bill credit each month when direct control to water heating is configured. Water heaters may be controlled up to 14 hours a day.
Minnesota | North Dakota | South Dakota | |
---|---|---|---|
Monthly Bill Credit | $10.00 | $8.00 | $8.00 |
Download | Download | Download |
For more details on rates and regulations concerning your electric service, contact our Customer Service Center or download the full text of our rates.